| Sign In | Join Free | My xxjcy.com |
|
| Categories | PVC Pipe Production Line |
|---|---|
| Brand Name: | Kechengda |
| Model Number: | KCD-SJ90 |
| Place of Origin: | Qingdao,Shandong,China |
| MOQ: | 1 |
| Payment Terms: | T/T |
| Supply Ability: | 100 |
| Delivery Time: | 35 work days |
| Packaging Details: | wrapping film |
| Product Type: | PE Pipe |
| Screw No.: | Double-screw |
| Extruder: | Single Screw Extrder |
| Applied Materials: | HDP Partical |
| Spercification: | 800-2200mm |
| Temperature Control: | Omron |
| Advantage: | High Speed |
| HS Code: | 8477209000 |
| Trademark: | Qingdao KCD |
| Transport Package: | Container |
| Validity: | 30days |
| Warranty: | 12month |
KCD-SJ90 HDPE Pipe Production Line/PVC Pipe Production Line/PPR Pipe Production Line
Brief introduction:
High efficiency single screw extruder is adopted for the large
diameter winding tube, and the optimized screw is from German
technology to ensure high speed and high quality extruder.Adopt
compound type head, double machine joint feed, spiral turn molding,
design is exquisite, design is unique, ensure the high quality of
the
product.Advanced PLC computer control system, advanced technology,
unique process design, playground for convenience, stable and
reliable.Raw material is HDPE granule.
The pipe produced by the large-diameter winding pipe equipment is
made of high-density polyethylene as the main raw material. The
rectangular pipe is first extruded through an extruder into the
winding forming machine, while the second extruder ejects rubber
strips and extrudes the composite. .
The inner and outer walls are flat and smooth, with a specification
of 400-2200mm. The ring stiffness is divided into 4 levels
according to different use conditions, which can reach 162, which
can be adapted to acid-base liquids below 10%. This kind of pipe
has corrosion resistance and light weight.
Easy to install, high flow rate, long life (50 years), etc. It can replace pipes made of high energy consumption materials (cement, cast iron, ceramics, etc.), widely used in highways, municipal construction, residential areas, sports fields, squares, and mines , Drainage and sewage pipelines in agriculture, culverts, bridges and other fields.
The Tecnology Spercification:
| Item | Diameter | Extruder | Total Power(kw ) | Capacitykg/h(max) | Dimension(m)(L×D×H) | |||
| Model | Extrudermodel | (L/D) | Motor(kw) | Heating(kw) | ||||
| ZY-800 | φ300-800 | ZY90×30 | 30:1 | 75 | 30 | 230 | 300 | 21.5×10×2.6 |
| ZY65×30 | 30:1 | 45 | 18 | |||||
| ZY-1200 | φ300-1200 | ZY90×30 | 30:1 | 110 | 36 | 330 | 500 | 23×10×2.7 |
| ZY65×30 | 30:1 | 75 | 18 | |||||
| ZY-1500 | φ800-1600 | ZY100×30 | 30:1 | 160 | 36 | 385 | 650 | 28×18×6 |
| ZY65×30 | 30:1 | 75 | 18 | |||||
| ZY-2200 | φ1500-2200 | ZY120×30 | 30:1 | 185 | 60 | 420 | 850 | 30×20×7 |
| ZY65×30 | 30:1 | 75 | 18 | |||||
Application:
- Sewage and drainage pipes
- Storm water drainage pipes
- Rain water sewage plastic pipes
- Cable protection pipes
- Civil construction sewage pipes
-Chemical storage tank
- Liquid storage tank
- Manhole wellbore
HDPE large diameter hollow wall winding pipe has been recognized as
a substitute for cement pipes and cast iron pipes because of its
superior properties for water drainage.Qingdao Kechengda is the
authority manufacture in China. We have the strongest technology
advantages and rich experience on pipe production and installation.
Our line has advantages of advanced design, high
configuration,reliable operation and long life span.The capacity of
same model is much higher than domestic industry. Especially big
models for large diameter pipes can meet the need of big customers
home and abroad. The quality and performance of our line reach
leading level in the world.
Pipe characteristics:
1. Chemical resistance: not corroded by sewage, waste water and
chemicals, and not corroded by decaying substances in the soil.
2. Impact resistance: The pipe wall adopts "I-shaped" structure,
which is impact resistant and pressure resistant. It will not break
even when the foundation is sinking. It has strong recovery after
deformation and has good adaptability to any foundation.
3. Aging resistance: The pipe is usually black, which can withstand
direct sunlight during storage and construction.
4. Cold resistance: The pipe will not be frozen, cracked, swelled
and leaked in an environment of -80°C.
5. Light weight: Easy to transport and easy to construct, it is 1/8
of the weight of the cement pipe. Only an excavator is needed to
bury the pipe without large equipment.
6. Convenient connection: The pipe can be connected outside the
trench first and pushed into the trench with an excavator. During
the construction of urban drainage projects, the required
engineering time and engineering costs can be reduced.
7. Superior abrasion resistance: It is more abrasion-resistant than
steel pipes and cement pipes, and has better transport capacity for
domestic water and waste residue.
8. Superior drainage fluidity: smooth inside, reducing friction,
and fast drainage.
9. Economy: Low raw material prices, low construction, management,
and maintenance costs.
10. Environmental impact: HDPE is a non-toxic raw material,
harmless to the land, and can be fully regenerated and recycled.
Production process and equipment composition
Single screw extruder → Vacuum calibration box → Winding forming
machine→Sol extruder → Cutting machine → Automatic stacker
Applicable material
HDPE particle.ect
TRADE TERMS
| ♦Delivery time: | 40 working days from down payment receipt |
| ♦ Packing: | Sea-worthy package mainly with wood pallets, film and some parts in wooden case. |
| ♦ Payment: | 30% as advance payment by T/T after signing contract; 70% as balance after inspection machine before delivery by T/T |
| ♦ Warranty: | 12 month |
| ♦ Validity: | 30 days |
Pre-sale service:
Analysis on customer requirements Engineer follow-up and design
scheme Test samples for customers Qualified, confirm order.
On-sale service:
Leverage core technologies to provide professional services
Attention to detail and careful manufacturing Continuous detection
and stable compliance Delivery Package Service.
After-sale service:
On-site commissioning and installation On-site operation training services Process training services Make a solution within 24 hours after the fault is declared Arrive on-site within 72 hours.
FAQ:
Q:Are you a trading company or a manufacturer?
A:We are a manufacturer and we can assure the quality of our
machine.
Q:What's your guarantee or the warranty of the quality if we buy
your machines?
A:We have one year warranty of the spare parts free of charge. If
any quality problems on our side occured in this period ,we will
can do some replacement.
Q: How do you quote for customers?
A: The price depends on the quality and performance, but customer
satisfaction is the first priority.
|