Sign In | Join Free | My xxjcy.com |
|
Categories | Centrifugal Spray Dryer |
---|---|
Brand Name: | SNYNXN |
Model Number: | GLP-5 |
Certification: | CE ISO GMP |
Place of Origin: | JIANGSU CHINA |
MOQ: | 1 |
Price: | Negotaible |
Payment Terms: | T/T, L/C |
Supply Ability: | 100 set/year |
Delivery Time: | within 60 days |
Packaging Details: | Film Wrapping, Wooden Case. |
Type: | Mini Spray Dryer |
Raw material: | raw liquid |
Working Process: | Continuous |
Evaporation Capacity: | Max. 5 (kg/h) |
Nozzle diameter: | 1mm |
Spray system: | Two- fluid nozzle (0.75/1.0/1.5/2.0/2.5mm) |
Special Design: | Corrosive / Explosive / Wall Adhesive |
Way to Discharge: | Touch Screen / Remote / Button |
Key Selling Points: | Long Service Life |
Dimension(L*W*H): | 940*850*1500mm |
Item / Model (GLP) | 5 | 25 | 50 | 100 | 150 | 200 | 500 | 800 | 1000 |
Inlet temperature (℃)) | 140-350 Automation | ||||||||
Outlet temperature (℃)) | 80-90 | ||||||||
Spray pattern | High speed centrifugal atomizer (mechanical drive/stepless
frequency control to choose) | ||||||||
Water evaporation (kg / h) | 5 | 25 | 50 | 100 | 150 | 200 | 500 | 800 | 1000 |
Atomizer speed (rpm) | 25000 | 22000 | 21500 | 18000 | 16000 | 13000 | 12000 | ||
Atomizing disc diameter (mm) | 60 | 120 | 150 | 180-210 | |||||
Electric heating maximum power (kw) | 8 | 31.5 | 60 | 81 | 99 | Equipped with other heat sources | |||
Powder recovery (%) | about 95% more | ||||||||
Covering length (m) | 1.6 | 4 | 4.5 | 5.2 | 7 | 7.5 | 12.5 | 13.5 | 14.5 |
Covering width (m) | 1.1 | 2.7 | 2.8 | 3.5 | 5.5 | 6 | 8 | 12 | 14 |
Tower height (m) | 1.75 | 4.5 | 5.5 | 6.7 | 7.2 | 8 | 10 | 11 | 15 |
Nozzle lifting height (m) | - - | 2.5 | 2.5 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 |
Note: The above data for reference only. Moisture evaporation and
material properties, solid content and the hot air inlet
temperature. Users can select the heating mode according to the
local energy situation, select the collecting, dedusting method
according to the material characteristics. |
FAQ
Q: Are you trading company or manufacturer ?What about your
after-sale service?
A: We are machine manufacturer. And we offer the before and after
service. First,we can offer the lab or sample for you.Then
inspection in my company, empty operation then export. And our
engineer will stay on site to do installation. Once broken, our
person will arrive in 72 hours. Any spare parts broken, we will
express in 12 hours.
Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock.
or it is 30-45 days to make the machines based on your request.
Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase
schedule.Just only one set is welcome.
Q: What is your terms of payment?
A: Payment<10000USD, 100% in advance. Payment>10000USD, 30%
T/T in advance, balance before shippment.
![]() |