Categories | Mini Cold Storage |
---|---|
Brand Name: | ECOOL |
Model Number: | EMN2 |
Certification: | ISO9001;CCC |
Place of Origin: | CHINA |
MOQ: | 1 set, 180M3 |
Price: | Negotiable |
Supply Ability: | 500 set per year |
Delivery Time: | 3-5weeks |
Packaging Details: | sea-worthy packing |
Product name:: | Portable PUR Panel Assembling Mini Cold Room Below 100 Tons for Fresh Keeping Fruits |
Rerigeration sytem: | Freon R22/R404a/R507a are available |
Application: | Storage fresh fruits |
Size: | 60M2~100M2 |
Room Temperature: | -5C~+8C |
Structure: | Panels |
Panel structure: | Polyurethane foam and steel panel |
Panel surface material: | Stainless steel,colored steel,galvanized steel etc |
Panel thickness: | 75/100/120/150/180/200/250mm |
PUR Panel Assembling Mini Cold Storage Below 100 Tons For Fresh Keeping Fruits
Quick details:
Different Temperature for Different Products:
Room function | Designed temperature range | |
°C | °F | |
Fresh keeping e.g. fruit, vegetable, eggs, milk room | -5 ~ + 10 | +23~+50 |
Frozen food cold storage room | -25~-18 | -13~-0.4 |
Compatitive Advantages
Application
Farm products storages,supermarket, factory, Hospital,home use
Steps of customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold room photos