Sign In | Join Free | My xxjcy.com
xxjcy.com
Products
Search by Category
Home > Copper >

Milk / Tea / Water Filler Machine Semi Automatic 3 In 1 CSD Filling Line

Categories Glass Bottle Filling Machine
Place of Origin: Jiangsu, China (Mainland)
Brand Name: Reliable
Certification: CE,TUV,SGS,ISO
Model Number: CGFD-C18-18-6
MOQ: 1 set
Price: 3500 - 132000USD
Packaging Details: Wooden package
Delivery Time: About 30~45 Days after receive down payment and sample bottles
Payment Terms: Irrevocable letter of credit or T / T
Supply Ability: 15sets / month
Port of loading: SHANGHAI
MOQ: One set
Type: Filling Machine
Voltage: 380V 50Hz
Control: PLC+ Touch Screen
Filling material: Flowing Liquid
Bottle size: 200ml-2000ml
Shippment Port: Shanghai Port
Warranty Period: 1 Year
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Milk / Tea / Water Filler Machine Semi Automatic 3 In 1 CSD Filling Line

    Milk / Tea / Water Filler Machine Semi Automatic 3 in 1 CSD Filling Line


    Quick Details

    NameGlass Bottle Filling Machine for Wine
    ColorSilver gray
    Capacity3500 ~ 75000bph
    MaterialFood stage ss304
    Suitable bottleGlass bottle
    CapAluminum Cap
    Bottle size300 ~ 1500 ml Glass Bottle
    FunctionRinsing filling capping 3 in 1
    CustomizedAcceptable
    OperationEasy & Stable
    Warranty1 year for spare parts


    Technical Data:

    Model

    CGFD18186

    CGFD24248

    CGFD323210

    CGFD404012

    Number of washing, filling and capping heads

    18-18-6

    24-24-8

    32-32-10

    40-40-12

    Production capacity(500ml)
    (B/H)

    3500~4500

    4500~5500

    5500 ~ 6500

    6500 ~ 7500

    Suitable bottle specification(mm)

    φ=50-110 H=150~340mm Volume=330-2500ml

    Washing pressure(kg/cm 2 )

    2-3

    Motor power(kw)

    Main motor
    4.0kw

    Main motor
    4.8kw

    Main motor
    7.6kw

    Main motor
    8.3kw

    Overall dimensions (mm)

    2650*1900*2400

    2900*2100
    *2400

    4100*2000
    *2400

    4550*2650
    *2400

    Weight (kg)

    3500

    4500

    6500

    8500


    Characteristics


    1)This Glass bottle filling machine is a unique design combining the three machines of bottle washing, filling and capping in one to decrease main power, to save space and to diminish the air pollution among the three machines.

    (2)It is applicable for Glass bottle filling machine filled in plastic bottles and capped with plastic caps, with optional capacity from 1200BPH to 12000BPH.

    (3)It is easy to change the size of bottles, which can be done by changing the filling machine thumb wheel without adjusting the height of the machine.

    (4)This Glass bottle filling machine adopt suspensory transmission gear can easily upkeep and be repaired.

    (5)This Glass bottle filling machine case and the parts contacting with the materials are made of stainless steel which ensures the good external look and easy washing.

    (6)This Glass bottle filling machine uses frequency changer to control the main machine motor. And it has an ouput number indicating function which is easy to control the adjustment of the output.


    Working principle


    Bottle rinsing part

    This part is made up of lifting device, the main transmission device, the fixed frame, clamp device, distributor, and open clamp cams and over turn cams etc.

    Lifting device is used to adjust the height of the rotary tables and clamps of machine to adapt to the bottle height. Its power comes from the lifting lever. Lever rotates drive screw rotation to realize the rotary tables lift.

    When the clamp rotate to star wheel with rotating table, bottle into the middle of clamp, open clamp cam close the clip claw and clip the bottleneck with the rotating clamp. When rotary tables to rotate, clamp pieces will rotate with over turn cam, guide cams rotates around over turn cam and flip the bottleneck to 180 degree till the bottle mouth is top downwards and directly face the spray nozzle, then the clean water in the spray nozzle sprays and wash the inside of the bottle, Drain, turn 180 degree downwards and then goes out from the star wheel.


    Filling part

    Beer filling machine is specially designed according to the beer feature, and the filling part is designed to be twice pre-evacuation.

    The filling part is made up of main liquid pipe, rotating cylinder bearing base, filling cylinder fulcrum loop, wine or carbonated drink tank, filling valve, filling cylinder pipe, control loop device, ascending device, the distributor, height adjusting control, stimulating bubble arm, vacuum system, etc.

    a. The first Vacuumize

    Open the Vacuum valve stem, in the bottle and vacuum channels forming a road. The air in the bottle will be discharged from bottle through this channel, in the bottle will form a vacuum. After reach the fixed time, Vacuum valve closed, then it will be finished.

    b. Gas injection

    Open the filling valve, a pathway is formed between the bottle and the gas channel. The gas filling into the bottle through this channel till gas pressure in wine tank equals to the beer tank pressure.

    c. The second vacuumizing

    After gas injection into the bottles, little air will be concentrated on the top of the bottle neck. By the second vacuumizing, this part of resting air will be removed and generate a slight-vacuum state, which is better for the filling work.

    d. Beer filling

    Open liquid valve and form pathway between the bottle and the beer tank, the material will feed into the bottle from this channel, at the same time, the CO2 in bottle return back to the beer tank at the same speed through air-back pipe. Compressed CO2 in the bottle seal material to continue to run till the material in bottle rising over air-back pipe and form pressure balance

    e. Close valve

    After the bottle finish filling stand for long time, close the liquor valves and air filling valves, cut off the channel between wine tank and bottle.

    f. Air discharge

    Open the discharge valves and form a pathway between bottle and air. The pressure in bottle will release through this channel and don’t finish release until bottle separate from filling parts.

    g. Blow remaining liquid

    When the filling parts locates between bottle-out and bottle-in star wheel, open the gas filling valves and close it after reach the fixed time. So that the gas in bottle will blow the remaining liquid.


    Capping part

    The capping machine is made up of cap holder, capping slideway, capping upper part, capping lower part, elevating part and anti-circling column.

    The up and down movement of the capping nozzle is driven by the capping cam, which is fixed. The screw or crown caps (one machine can only has one kind of capping part) are sending to the cap slideway by a mixer in the cap container, and then slid to the capping mould of the capping nozzle. The capping nozzle is driven by power and move in circle. The capping nozzle would move upword and downward one time in each circle of the capping. The cam, set up in the upper fixed part of the capping machine, controls the upward and downward movement of the capping nozzle.

    After the bottle is transmitted from the filling machine, the capping nozzles have been fed with a bottle cap. The capping nozzles moves downwards the bottle under the capping platform driven by cam guideway, then the bottle cap with the aid of the damping ring.

    What service Reliable Machinery Co.,Ltd can offer you


    • Your inquiry related to our product & price will be replied within 24hours
    • Well-trained & experienced staff are to answer all your inquiries in English and Chinese
    • Working time: 8:30am ~6:00pm, Monday to Friday(UTC+8).
    • OEM & ODM projects are both available
    • Your business relationship with us will be confidential to any third party.
    • Good after-sale service offered, please get back to us if you got any questions


    Warranty and Installation

    1. Engineer will be sent to your side as soon as you get all your machines ready.
    2. Installment USD60~150/day. Person as allowance
    3. Training fee is free for customer’s workers within the installation period
    4. We have one year warranty and come with at least one year recommended spare parts

    Quality Milk / Tea / Water Filler Machine Semi Automatic 3 In 1 CSD Filling Line for sale
    Send your message to this supplier
     
    *From:
    *To: China Zhangjiagang Reliable Machinery Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0